Installed by Switzerland-based MET Group, the project is powered by Tesla Megapack 2 units, supplied by Huawei Technologies’ battery units, and built by Forest-Vill and follows a smaller 4 MW / 8 MWh pilot at the same site in 2022.
[pdf] The solar power plant will be constructed in Bakuma Town, Lofa County, and serve as the backbone of a hybrid generation system, also featuring a 1.8 MW diesel plant and a 250,000-liter underground diesel storage unit.
[pdf] This roadmap provides necessary information to support owners, opera-tors, and developers of energy storage in proactively designing, building, operating, and maintaining these systems to minimize fire risk and ensure the safety of the public, operators, and environment.
[pdf]