According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in a single phase. The project construction is likely to commence in 2026 and is expected to enter into commercial operation in 2027.
[pdf] 
Built by French renewable energy giant Neon, the Cestas Solar Park is France’s largest operational solar project at the moment with an enormous 300 MW of total solar capacity. Construction on the park began in late 2014 in Cestas, near the French border with Portugal, and the park came online in. .
The Toul-Rosières Solar Park was the largest solar project in the world when its construction finished in June 2012, and it remains France’s. .
The Les Mées Solar Park consists of several different solar farms constructed on the sprawling La Colle des Mées plateau of Southern France, 800 meters above sea level. The. .
The 67.5 MW Gabardan Solar Park in the Landes region of Southwestern France is another French solar project which uses First Solar’s advanced thin-film PV modules. The park. .
The Crucey Solar Park entered operation in 2012, after construction began in 2009. Developed by EDF Energies Nouvelle, the plant’s 741,000 thin-film PV modules boast 60 MW of total capacity. The park is located near the Central Paris region, near the commune of. In France, start of construction of three photovoltaic projects Voltalia (Euronext Paris, ISIN code: FR0011995588), an international player in renewable energy, launches construction of three new solar power plants in the south of France with a total capacity of 25.1 megawatts
[pdf] Brunei has commenced construction on its largest solar power project to date, the 30-megawatt (MW) Sengkurong Solar Plant. This project represents a collaborative effort between Mitsubishi Corporation, Brunei Investment Agency, and Brunei Shell Petroleum.
[pdf]