Dutch startup Ore Energy has connected its iron-air battery to the grid in Delft, the Netherlands. The company announced the system is the first of its kind to be fully operational and grid-connected in the world, while also being the first fully-built in the European Union.
[pdf] With ambitious plans to achieve a 300 MW energy storage capacity by 2027, the nation aims to enhance the stability and reliability of its electricity grid, paving the way for a sustainable future.
[pdf] Tesla has unveiled two new energy storage products: Megapack 3, the latest generation of its utility-scale energy storage system, and Megablock, which integrates Megapack 3 with transformers and switchgear.
[pdf]